Professional buildings

Make the most of a rooftop while protecting the building.

Industry, tertiary sector, warehouse, hangar or agricultural building: the study must reconcile structure, waterproofing, security, site operation and energy performance.

Regulatory information verified on June 24, 2026.

Large professional roof equipped with photovoltaic panels
BuildingsIndustry, tertiary, logistics

Warehouses, businesses, offices, hangars and agricultural buildings.

UsesSelf-consumption or sale

Scenario adapted to consumption and the economic model.

ConstraintsStructure, ERP, ICPE

Technical and regulatory verifications depending on the activity.

DeliverablesPlans, energy yield & economics

Documents adapted to the level of progress of the project.

AYM ENERGIE study

What we check before recommending a solution.

Installable capacity is never the only criterion. The site, its use, the grid, local constraints and project economics must remain consistent.

01

Roof capacity

Useful surface area, loads, spans, condition of the roof, waterproofing and possible reinforcement needs.

02

Safety and Operation

Access, circulation, smoke extraction, technical equipment, maintenance and business continuity.

03

Electrical profile

Load curves, subscribed power, self-consumption, injection and connection architecture.

04

Technical implementation

Layout, setbacks, electrical rooms, cable trays, inverters and interfaces with the building.

05

Economic performance

Productivity, CAPEX, connection costs, savings, revenues and valuation scenarios.

06

Administrative framework

Town planning, roofing obligations, ERP/ICPE constraints and technical documents in the file.

Regulations & procedures

Rules to know before submitting the project.

Certain professional buildings are subject to renewable energy production or greening obligations during their construction, extension or major renovation. The project must also respect the safety rules specific to the site’s activity.

  1. Buildings concernedThe Construction Code targets in particular commercial, industrial, artisanal, administrative buildings, offices, warehouses, commercially operated hangars, hospitals, sports facilities and school buildings exceeding certain thresholds.
  2. Load thresholdThe obligation applies in particular to constructions creating more than 500 m² of footprint, as well as to certain extensions and major renovations of more than 500 m².
  3. Minimum surface areaThe minimum roof proportion increases to 40% from July 1, 2026, then to 50% from July 1, 2027.
  4. ExceptionsExemptions may exist for financial, technical, architectural or security constraints or when costs are disproportionate.
  5. Special casesERP, ICPE sites and buildings with roof safety devices require specific checks.
Recommended route

Transform an idea into a documented decision.

01

Collect data

Plans, framework, roofing, consumption, activity and technical equipment.

02

Check support

Analyze the structure, waterproofing, access and safety constraints.

03

Build the scenarios

Compare power, layout, self-consumption, injection and connection.

04

Document the choice

Produce plans, hypotheses, results and limits useful to the project owner.

05

Prepare the production

Coordinate technical interfaces before the consultation or construction site.

Frequently asked questions

The first answers to frame the project.

Depending on the building and the operation, the obligation can be met by a renewable production process, a greening system or another equivalent device, subject to applicable texts.
It is essential when the bearing capacity is not documented or the roof presents particular constraints. It may require the intervention of a structural engineering consultancy.
A first estimate is possible, but the load curves greatly improve the precision of the sizing and economic analysis.

Do you have a professional roof to study?

Transmit the plans, consumption and known constraints of the building.